LNG Solutions - Liquefaction
5,600 workers
at peak
25,000
indirect local jobs
90%
workforce was Peruvian
27 million
work-hours
Scope
EPC
Location
Peru
Highlights
- First base load LNG liquefaction project in South America
- Lowest $/tpa LNG of its era
- Designed for one of the most seismically active regions in the world
- Project was delivered on time and under budget with a safety record that was ten times better than the industry average
Engineering, procurement and construction contractor for South America's first LNG liquefaction facility, located in the remote Pampa Melchorita region. The facility has a production capacity of 4.5 million tons per year and utilizes a propane pre-cooled mixed refrigerant process. It cools natural gas to -160°C (-260°F), reducing its volume by approximately 600 times for efficient storage and transport. Key systems include four refrigeration compressors, two gas turbines and a fully integrated support infrastructure.