LNG Solutions - Regasification
Four 190,000m³
LNG storage tanks
1000 MMSCFD
increase in sendout then additional 700 MMSCFD
12,000m³/hr
addition trans-shipment facilities
Scope
FEED & EPC
Location
United Kingdom
Highlights
- Conversion of existing LNG Peak shaving facility to LNG import terminal
- Multiple brownfield expansions
- Was the world’s largest above-ground LNG full containment tank (190,000m3) at the time of project execution
- Total of 1700 MMSCFD send out capacity
The multiple expansions carried out at the Isle of Grain facility converted the existing peak-shaving facility into a large import terminal with the flexibility to achieve send out, trans-shipment, and road tanker exports. The facilities added included marine works, LNG storage, 4 x 190,00m3 storage tanks, regasification and sendout systems, pipelines, loading facilities, buildings and all support systems.