LNG Solutions - Liquefaction
Three-train
LNG facility
15.6 Mtpa
export capacity
>9,000
workforce (at peak during construction phase)
Scope
Pre-FEED, FEED, EPC & Commissioning
Location
USA
Highlights
- We assumed the role of joint venture lead during project execution
- Expansion of existing regasification facility built by McDermott, completed in 2010
- Utilizes Honeywell LNG's propane pre-cooled, mixed refrigerant (C3MR) technology
- Electric power generated by steam from heat recovery steam generation units
Lead partner in joint venture with Chiyoda, responsible for engineering, procurement, construction and commissioning of LNG liquefaction plant. Scope includes three liquefaction trains with all necessary process and utility units. The project utilizes the existing LNG storage and marine facilities, upgraded to enable loading of Qmax-size LNG tankers.